# Cornice Framing on Parapets

**Purpose**

Framing parapets at the truss manufacturer location reduces the amount of framing in the field.

![](/images/csdirector-cstruss/resources/images/ts-parapetflagframing.png)

**Steps**

1. Gather required parapet dimensions.
2. Create work lines on the main truss, if desired.


![](/images/csdirector-cstruss/resources/images/note-onlinehelp.png) **Note:** The insertion point for the bottom piece of parapet framing is required. Dimension at the intersection of the bottom piece of parapet framing and the vertical parapet leg is required.

![](/images/csdirector-cstruss/resources/images/ts-parapetflagframinginsertpoint.png)

1. Using Filler, insert the top piece of the parapet framing.


![](/images/csdirector-cstruss/resources/images/ts-filler-parapet.png)

![](/images/csdirector-cstruss/resources/images/ts-filler-parapetex1.png)

Note: You can also use Add Board to create this piece as a Filler Chord.

1. Using Filler, insert the bottom piece of the parapet framing. Trim as required.


![](/images/csdirector-cstruss/resources/images/ts-filler-parapet-insertpoint.png)

![](/images/csdirector-cstruss/resources/images/ts-filler-parapetex2.png)

1. Create a test truss representative of the parapet framing to generate reactions.


![](/images/csdirector-cstruss/resources/images/ts-filler-parapetex3.png)

1. On the main truss, go to **Component > Load Transfer**.
2. Select the test truss as the Child Truss Candidate, as shown below. Input options for both the top and bottom Child Truss Bearings.


![](/images/csdirector-cstruss/resources/images/ts-parapet-loadtransfer.png)

![](/images/csdirector-cstruss/resources/images/note-onlinehelp.png) **Note:** This will transfer only vertical loading; lateral loading also must be applied.

1. On the main truss, go to **Component > Special**.


**Group A:**

i. Enter a point load at the top of the parapet that is equal to the horizontal reaction of the test truss at the top chord.

ii. Enter a point load at the intersection of the bottom piece of parapet framing and the vertical parapet leg that is equal to the horizontal reaction of the test truss at the bottom chord.

**Group B:**

i. Enter a point load at the top of the parapet that is equal to the horizontal reaction of the test truss at the top chord in the opposite direction of Group A.

ii. Enter a point load at the intersection of the bottom piece of parapet framing and the vertical parapet leg that is equal to the horizontal reaction of the test truss at the bottom chord in the opposite direction of Group A.

![](/images/csdirector-cstruss/resources/images/ts-filler-parapetex4.png)

1. On the main truss go to **Combinations**. Copy the Dead + Live + Snow load case. Edit the copied load case, rename as necessary and apply 1.00 to Group A.


![](/images/csdirector-cstruss/resources/images/note-onlinehelp.png) **Note:** Copying this load case again and applying -1.00 to Group A will also reverse the load directions.

![](/images/csdirector-cstruss/resources/images/ts-filler-parapet-loadcombos.png)

1. On the main truss, go to Combinations. Copy the Dead + Live + Snow load case. Edit the copied load case, rename as necessary and apply 1.00 to Group B.
2. Design main truss and adjust plates, as required.


![](/images/csdirector-cstruss/resources/images/note-onlinehelp.png) **Note:** Plates applied to Filler and Add Board pieces are **not** analyzed for design loads.

**Related Topics**