# Project Information View - Quantity Relationship Summary

The Components, Miscellaneous, Sets, Plans/Elevations and Deliveries icons interact to represent all items within the selected project

Access the project in view or edit mode to display the Project Information specifics.

### Project Information View Quantity Relationship Summary

![](/images/csdirector-cstruss/images/d-projectquantityrelationshipsummary.png)

Quantity relationships are most easily explained by working backwards.

| Term | Definition | Comments |
|  --- | --- | --- |
| Lot Multiplier
 | The number of open (production ready) lots referencing the plan/elevation.
 | This value is located at the end of the elevation label for Plans/Elevations (P/E).
![](/images/csdirector-cstruss/images/d-lotmultiplier.png)
 |
| P/E Batch Quantity
 | Lot Multiplier * Quantity in P/E
 | The Elevation A Lot Multiplier is 3.
T06 Quantity in P/E is 2.
T05 Quantity in P/E is 1.
![](/images/csdirector-cstruss/images/d-planelevationbatchquantity.png)
T06 P/E Batch Quantity is 6.
T05 P/E Batch Quantity is 3.
 |
| Set Multiplier
 | Sum of all P/E Batch Quantities
 | Sets can be referenced on multiple plan/elevations. Each P/E applies the Lot multiplier to the quantity of each Set in the P/E to determine the P/E Batch Quantity.
![](/images/csdirector-cstruss/images/d-setmultiplier.png)
If Hip A is in P/E 1/A twice and P/E 1/A is referenced by three lots then the Sets Multiplier for Hip A is 6.
 |
| Set Batch Quantity | Set Multiplier * Quantity in Set | Calculated in the same way as the P/E Batch Quantity. Each component has a value. |
| Misc Quantity | Sum of all P/E Batch Quantities | Calculated in the same way as the Set Multiplier |
| Component Quantity
 | Sum of all P/E Batch Quantities + Sum of all Sets Batch Quantities
 | The total number of times the component is referenced in the project.
Quantities on the Components tab are used for Batching by Component Groups
 |


Example:

- T01 is used in plan/elevation 1/A 5 times.
- Plan 1/A is referenced by 3 lots that are ready for production.
- T01 is used in plan/elevation 2/A 10 times.
- Plan 2/A is referenced by 4 lots that are ready for production.
- There are no other lots that are ready for production that reference a plan/elevation using T01.
- The quantity for T01 on the Components tab would be 55.