# Check for Design Criteria Inconsistencies

**Description**

Design criteria inconsistencies between trusses, including loads and building codes, may lead to questions by building officials and/or Engineer of Record (EOR).

To avoid component review delays and mitigate challenges with building officials and/or EOR, use the Run Design Check Prior to Sending Engineering utility for all projects. The Design Check tool performs a review of all trusses in a project and identifies any inconsistencies.

**Design Practices**

As a best practice, the **Run Design Check Prior to Sending Engineering** option should be run for all projects.

**Required Actions**

1. Select **Run Design Check Prior to Sending Engineering**.
2. From **Components > Engineering**, select **Run Design Check** and select all trusses in a job.
3. Click **Send Components**.


![](/images/csdirector-cstruss/resources/images/cr-design-check-prior-to-eng-969x567.png)

If inconsistencies are identified between truss designs in a project, a message displays.

![](/images/csdirector-cstruss/resources/images/cr-inconsistentcomponentsfound-979x564.png)

1. Click **No**.


When inconsistencies are present, the design criteria field tabs are displayed in red.

![](/images/csdirector-cstruss/resources/images/cr-inconsistencyerrors-962x558.png)

1. Click a red tab to display a detailed error listing.


![](/images/csdirector-cstruss/resources/images/cr-redtab-errors-1038x605.png)

1. Review the components with inconsistencies to validate and/or correct the settings.